Chandigarh: Soon, non-motorised hall to join Sector 17 with Capitol Complex
Destination

Chandigarh: Soon, non-motorised hall to join Sector 17 with Capitol Complex

CHANDIGARH Capitol Complex, Capitol Complex chandigarh, chandigarh Sector 17 non-motorised boulevard, chandigarh Capitol Complex non-motorised boulevard, chandigarh administration, chandigarh city info,
At Commence Hand monument. (Bid Archives)

THE CHANDIGARH Administration is coming up with a obvious non-motorised hall that will join Sector 17 to Capitol Complex. This hall will advance up at a mark of Rs 1.37 crore.

This hall, that will perchance well glean a pedestrian and a bicycle tune, will join three sectors in between sooner than sooner or later resulting within the Capitol Complex.

A gentle has been floated by the division which says that the undertaking shall be undertaken below the holistic concept for revitalisation of Sector 17.

The hall will shuffle thru Jan Marg, Sector 17 after which from Sector Sixteen to Sector eleven after which to sectors 2/3 and sooner or later attain Sector 1, Capitol Complex.

A senior legit of the UT engineering fly acknowledged, “We require a merely connecting passage from Sector 17 to Capitol Complex. The aim of this hall is that vacationers coming to the plaza in Sector 17 who admire to take a look at the Capitol complicated can glean entry to this remark route. Sector 17, finally, needs to be made a non-motorised zone.”

He added, “We halt glean cycle tracks on obvious stretches nonetheless at some areas, bus stops are coming within the vogue so we prefer this remark connecting passage. We are in a position to withhold heritage walks on this besides.”

The UT engineering fly has situation a level in time of six months to total the undertaking from the date of share of gentle. The closing date for submission of bids is August 19, as per the gentle cramped print.

Basically essentially based on officials of the UT engineering fly, the factor of civil work within the total price would be of Rs 1.26 crore, public well being work would be Rs 7.46 lakh and electrical set up would be Rs 3.18 lakh.

This would possibly possibly also be the first undertaking to be applied below the revitalisation of Sector 17. Currently, a French delegation that visited Chandigarh to withhold discussions below the well-organized city undertaking expressed eager curiosity within the revitalisation of Sector 17 besides. The delegation visited Sector 17 and used to be fast by the officials that they aim to develop it a non-motorised zone totally. It used to be then that the connectivity to other vacationer areas in Chandigarh used to be discussed too.

In 2017, a slew of initiatives in Sector 17 had been kicked off by UT Administrator V P Singh Badnore. But they’re but to clutch off. The foundation stone of an city park used to be laid which used to be to be developed on an home of 60 acres at a mark of Rs eleven.50 crore. The work used to be to be accomplished within twelve months nonetheless nothing took place. Integrating present soccer ground and a inexperienced belt, multipurpose play court docket, three initiating badminton courts, amphitheater having a skill of 200 of us, and an outdoors LED show conceal are some of its aspects.

Read More

August 12, 2019

Leave a Reply

Twitter
Flickr
ABOUT

Paper Post brings the top and important news from the top news media of the world. You can send us any local news & we will verify and publish it. We believe that our earth is for everyone & if you want to make it better  for everyone then write & help us.

support@paperpost.org